中文  |  EN

Argumentation on the Use of Sea Areas Project (Phase I) of Taiping Bay Port Area of the Dalian Port (in cooperation with National Marine Environmental Monitoring Center)

发布时间:2018-09-05         信息来源:系统管理员         阅读次数:132

20 大连港太平湾港区一期海域使用论证(与国际海洋环境监测中心联合).jpg

Scale of construction:

According to the plan for the use of sea areas in the first phase, 8 general and bulk cargo berths will be built with the length of terminal shoreline reaching 2.25 km. The total area of the port is 11.8 km2. The sea area for land use (reclamation) is 4.8 km2. The sea area for basin and channel use is about 4.2 km2.