Feasibility Study on the Terminal Project of Huanghua Integrated Port Area

发布时间:2018-09-05         信息来源:系统管理员         阅读次数:150

17 黄骅综合港区码头工程可研.jpg

Scale of construction:

Container terminal: three 50,000-DWT container berths (hydraulic structure designed for 100,000-DWT ships), the total berth length: 999 m.

Ro-Ro terminal: one 50,000-GT ro-ro berth and one 70,000-GT ro-ro berth, the total berth length: 747 m.

General cargo terminal: two 100,000 general cargo berths, the total berth length: 559 m.