Proposal for the New Airport Coastal Business District Land Consolidation and Infrastructure Construction Project of Dalian

发布时间:2018-09-05         信息来源:系统管理员         阅读次数:139

Scale of construction:

The total area of construction land is 12.8 km2, including 5.4 km2 for reclamation and 7.3 km2 for land consolidation. The total length of permanent landscape revetment is 15.61 km and the volume of backfill is approximately 53,060,000 m3. The traffic network covers 83 km. In addition to the utility tunnel with a length of 6.51 km, the pipe network for water supply, power supply, heat supply, gas supply, drainage, sewage and communication will also be built.