中文  |  EN

Feasibility Study on the Algeria Central Port Project

发布时间:2018-09-05         信息来源:系统管理员         阅读次数:264

11 阿尔及利亚中心港项目.jpg

Scale of construction:

21 container berths, bulk and general cargo berths and auxiliary ship berths, and their related land supporting facilities; the total length of the terminal: 6,350 m; the length of breakwater: 2,395 m; the length of bank revetment: 4,748 m; the occupied area: 6,800,000 m2; the annual throughput: 6,300,000 TEU for containers, 25,700,000 tons for bulk and general cargo.