中文  |  EN

Development Plan & Assumptions and General Layout Planning Report of Ports of Dalian Petrochemical Co., Ltd. under CNPC

发布时间:2018-09-05         信息来源:系统管理员         阅读次数:159


The shoreline of Port is about 4 km long.

4 berths are planned in the first phase with a handling capacity reaching 19,210,000 t/a.

11 berths are planned in the second phase with a handling capacity reaching 21,320,000 t/a.

3 berths are planned in the third phase with a handling capacity reaching 4,030,000 t/a.