中文  |  EN

Master Planning and Its Revisions of Lyushun New Port Area of the Dalian Port

发布时间:2018-09-05         信息来源:系统管理员         阅读次数:159

The port area has a land area of 5.62 km2, a water area of 2.16 km2 and 32 planned berths (including 18 deep-water berths) with a handling capacity of 33,300,000 tons. The terminal shoreline covers a total length of 9,367 m, including the deep-water shoreline which is5,845 m in length.