中文  |  EN

Detailed Regulatory Planning of the Ship and Equipment Manufacturing Area of Changxing Island Harbor Industrial Zone, Dalian

发布时间:2018-09-05         信息来源:系统管理员         阅读次数:142

06 长兴岛临港工业区船舶及装备制造区控制性详细规划.jpg

The area is planned to cover an area of 17.5 km2 on land,13.7 km2 on waters, a terminal shoreline of 19.83 km length, a total dredging volume of 96,910,000 m3 and a reclamation area of 28.6 km2.